Access and controls
PDF Sharing Handoff Checklist: What to Save Before a Link Ends
Keep a clean record of the PDF you sent, the version approved, your access settings and the final file before closing a job.
Treat the share URL as a delivery route, not your archive. At the end of a job, keep the exact PDF you submitted, the version accepted, the decision or message that recorded acceptance, and any sharing details that matter later. Then close access according to your retention policy.
Build a small, readable handoff folder
- Save the exact files, not just the editable artwork. Use names that distinguish the purpose and revision:
River-Studio_Label_Proof_r02.pdfandRiver-Studio_Label_Final_r02.pdf. - Record what you shared. Write down the link label, recipient group, date sent, planned expiry, and whether downloads were allowed. Do not store the password with the link in a broadly shared folder.
- Record the decision separately. Keep the email or review record that says what was approved, by whom, and for which revision. Put unresolved notes in the handoff instead of implying they were accepted.
- Check the file before moving it to production. Open the saved PDF. Confirm the visible revision, page count and the intended finished dimensions or proof notes. A QA check is still necessary even if the recipient said yes.
- Close or extend access intentionally. Turn off the review link if the review is over. If customers need a long-term download, give them the correct final file and specify which link they should keep.
For recurring or higher-stakes handoffs, a checksum offers an extra check that the saved copy matches the selected file. It does not by itself prove who produced or approved the file. The Library of Congress distinguishes this type of integrity checking from the rest of digital collections management. Library of Congress data integrity guidance
Example: a print job with two reviews
A customer wants the logo moved after v1. Save v1 and its comments, then send v2 for explicit review. If you replace the PDF behind a stable link, keep your own copy of v1 and make the change unambiguous in the subject line. PDFtoLinkConverter's paid link replacement keeps the share URL; that alone is not an archive or an approval ledger. DielineMaker's guide to captured review revisions

Questions and answers
Is the share URL enough for an archive?
No. A link can expire, be revoked, or later show another file. Keep the exact PDF and the relevant decision outside the sharing app.
Should I keep every revision?
Keep the versions required by your company, customer agreement or recordkeeping process. Preserve approved and superseded versions when the distinction matters.
Do tracked opens prove the customer approved the file?
No. Keep an explicit approval tied to an identifiable version or exact file.
Can I rely on link replacement to recover the earlier PDF?
No. Keep copies yourself before replacing anything. The update feature is for keeping the URL stable, not a promise of restoration.
What can I send to the production team?
The designated final PDF, its version or digest where needed, and the approval record. Mark draft proofs as drafts and keep them out of the production folder.